HomeCost Radar

Home maintenance rules methodology

Version 1.0.0 · ACTIVE · released 2026-06-20

Formula

Tasks derived from templates gated by climate zone, components, pet, and pool; interval adjusted for triggers; due date from interval + last completion.

Default assumptions

firstTimeDueNowtrue
petHalvesFilterIntervaltrue

Not included

  • Personalization is coarse (state-level climate); local conditions vary
  • This is planning guidance, not an inspection or a safety certification

Change log

1.0.0: initial release. Climate/component/pet/pool gating; pet-adjusted filter interval.

Reviewed by: methodology. Historical estimates are never overwritten when a methodology changes.

Back to the maintenance planner